Tech Info

Please click on the links below for the information you require. If you have any questions please contact our sales office.


**Please note that the below documents are large, and therefore may take a few moments to load**

lakes-summit-icon 199 x 83
 

Stage 3A/B Spring Release

 

Stages 3A/B Summer Release

Stage 3A/B Spring - Covenants   Stage 3A/B Summer - Covenants

Stage 3A/B Reports

Geotech Report   Retaining Wall As Built
Geotech Report Appendix A, Figures   Western Batter Drain As Built
Geotech Report Appendix B, Geo Suitability and Data Summary   Water Reticulation As Built, Page 1
Geotech Report Appendix C, Pre Development Investigation Data   Water Reticulation As Built, Page 2
Geotech Report Appendix D, Post Development Borehole Logs   Water Reticulation As Built, Page 3
Geotech Report Appendix E, Fill Test Summary Tables   Wastewater Reticulation As Built, Page 1
Geotech Report Appendix F, Liquefaction Calculations   Wastewater Reticulation As Built, Page 2
Geotech Report Appendix G, Walkway Construction Observations   Wastewater Reticulation As Built, Page 3
Stormwater Reticulation As Built, Page 1   Wastewater Reticulation As Built, Page 4
Stormwater Reticulation As Built, Page 2   Wastewater Reticulation As Built, Page 5
Stormwater Reticulation As Built, Page 3   Streetscape & Transportation As Built, Page 1
Stormwater Reticulation As Built, Page 4   Streetscape & Transportation As Built, Page 2
Stormwater Reticulation As Built, Page 5   Streetscape & Transportation As Built, Page 3
Stormwater Reticulation As Built, Page 6   Streetscape & Transportation As Built, Page 4
    Streetscape & Transportation As Built, Page 5

Stage 3C/D Reports
 
Stage 3C/D - Covenants
Stage 3C/D - Geotech Report
Stage 3CD - Acoustic Report
Stage 3CD - Asbuilt Reports -Sewer/Stormwater/Water/Streetscape and Transportation

Stage 3E/M Reports
 
Stage 3E - Covenants
Stage E/M Geotech Report
Stage E - Stormwater Reticulation
Stage E - Stormwater Connections and Manholes
Stage E - Wastewater Reticulation
Stage E - Wastewater Connections and Manholes
Stage E - Water Reticulation: Sheet 1
Stage E - Water Reticulation: Sheet 2
Stage E - Streetscape and Transportation: Sheet 1
Stage E - Streetscape and Transportation:  Sheet 2
 

central 200wide

Stage 2I/N Ellesmere Close

Stages 2Q/R Rochfort Cres & 2S/T Conniston Way

Covenants Covenants
Geotech Report Stage 2Q/R/S/T - Geotech Report
Stage 2T (Lots 887/888/889) - Geotech Report
Water Reticulation Asbuilt Water Reticulation Asbuilt
Wastewater Asbuilt Wastewater Reticulation Asbuilt
Stormwater Reticulation Asbuilt Stormwater Reticulation Asbuilt
Streetscape & Transportation Asbuilt Streetscape & Transportation Asbuilt
Ultrafast Fibre Stage 2S - Noise Wall Asbuilt
  Ultrafast Fibre
  Stage 2T Lots 887/888/889 Geotech Report

Stage 2P

Stage 2P2
Covenants Covenants
Geotech Report  
Water Reticulation Asbuilt Water Reticulation Asbuilt
Wastewater Asbuilt Wastewater Asbuilt
Stormwater Reticulation Asbuilt Stormwater Reticulation Asbuilt
Streetscape and Transportation Asbuilt Streetscape and Transportation Asbuilt
Noise Wall Asbuilt Noise Wall Asbuilt

Stage 2U/V
Covenants  

 

Pinnacle at The Lakes Icon

Stage 2K/M - Benmore Crescent

Covenants
Stage 2K - Geotech Report
Stage 2K - Water Reticulation Asbuilt
Stage 2K - Wastewater Reticulation Asbuilt
Stage 2K - Stormwater Reticulation Asbuilt
Stage 2K - Streetscape & Transportation Asbuilt
Stage 2K - Ultrafast Fibre


Lakeside at The Lakes Icon

Stage 2H - The Pointe

Covenants
Geotech Report Appendix 1
Geotech Report Appendix 2
Geotech Report Appendix 3
Geotech Report Appendix 4 - (Part 1)
Geotech Report Appendix 4 - (Part 2)
Geotech Report Appendix 4 - (Part 3)
Geotech Report Appendix 5
Geotech Report Appendix 6
Asbuilt Plan - To Come

 

parkside 200

Stage 2A

Stage 2B

Stage 2D

Covenants Covenants Geotech Report Part 1
Geotech Report Geotech Report Geotech Report Part 2
    Geotech Report Part 3
 

Stage 2F

Stage 2G

Covenants Covenants
Geotech Report Geotech Report



 

Keep informed 

Register for our newsletter to be kept informed on what's happening at The Lakes.
The Lakes Tauranga Register Your Interest Button

Facebook - The Lakes Tauranga  Check us out on Facebook

Carrus
 

Find Our Team

map The Lakes Information and Sales Pavilion

154 Lakes Boulevard, 
The Lakes,
Tauranga

VIEW MAP
 

Get in touch

0800 843 525 
P: 07 543 1730
F: 07 543 1735
E: sales@thelakestauranga.co.nz

Sales Office:
154 Lakes Boulevard, The Lakes

The Lakes Tauranga Enquire Button